Alle berichten

murdomurray Just connect the ground output (black) to the POSITIVE supply of the circuit, and the -12V (red) connector to the GROUND Supply. Be sure to have the circuit isolated from any other circuits including any output signals..

2019-10-22 08:05:27 Nuttig (4)
Verzenden
antwoorden (7)

BG429352233 about all technical details you can read in description

2022-02-18 03:48:21 Nuttig (0)
Verzenden
antwoorden (1)

OGHagen Wow dude. You are really cranking them out. 4 of this tower. You must really like bending LED leads. I've just finished a 12x12 and 95% of a 16x16 tower. I thought that was a chore. Hey, could someone make a 64x128 Canton tower for 312harhue51 please?

312harhue51 05/03/2021
2
Reacties (5)

Q: is it waterproof

gevraagd door Arkatitanic op 2019-09-02 04:39:32

OGHagen Not waterproof

2021-08-04 04:04:40 Nuttig (0)
Verzenden
antwoorden (24)

OGHagen You are lucky if you get it to record anything at all. You will also be disappointed by the result.

2021-08-04 04:04:19 Nuttig (0)
Verzenden
antwoorden (4)

Q: What is the difference between "Type: B" and "Type: C" choice?

gevraagd door TrackerJack op 2017-11-19 10:19:37

OGHagen The colors in the display.

2021-08-04 04:01:09 Nuttig (0)
Verzenden
antwoorden (2)

Q: it is a waterproof

gevraagd door shashihassan823 op 2020-01-17 02:21:52

OGHagen No. It is absolutely not waterproof.

2021-08-04 03:55:28 Nuttig (0)
Verzenden
antwoorden (2)

OGHagen I have this kit laying around. I have not started assembly yet as the tiny pitch of the square chip is a challenge. You hot aired soldered that? I have several kinds of flux and solder paste in syringes, but not a electric hot air gun. I have a butane soldering iron kit with sort of a tube attachment tip. Is that what you used? In picture 8 the area around the chip looks kind of scorched. Why is that?

gauravsanu 20/03/2021
8
Reacties (6)

OGHagen The 25? May be the week number. We have many kinds of keeping track of time. Hours, minutes, years, months, day of the month, day of the week. Week number is yet another one and it is probably the less used. Week number is often used in planning for activities. Common in the field of construction. Today is Saturday July 31 2021 week 30. For me and where I live that is. The same is true in the US. Tomorrow will still be week 30. However in the US it will be week 31. That is because we count Monday as the first day of the week. In the US it is Sundays. In Islamic countries it is Saturdays. In Saudi Arabia it is now week 32. Yep. This is because what counts as week 1 is also different within this systems. January 1, January 4 or Thursday.

2021-07-31 11:23:43 Nuttig (1)
Verzenden
antwoorden (4)

Q: Does this particular model require welding?

gevraagd door BG215201972 op 2021-07-11 11:10:56

OGHagen I would assume soldering is needed. In picture 3 all the small parts are shown individually. In picture 7 they are soldered on. The tricky part to solder is the small square chip on the right hand side in picture 7.

2021-07-31 10:06:22 Nuttig (0)
Verzenden
antwoorden (1)

OGHagen Are you sure you didn't just misplace it? The one I received were just wrapped in ordinary masking tape together with a very small piece of foam material.

2021-07-28 11:00:32 Nuttig (1)
Verzenden
antwoorden (2)

Q: POWER SUPPLY ? WHERE TO CONNECT ? AND WHAT VOLTAGE CURRENT ?

gevraagd door s_rm2002 op 2019-04-16 06:44:10

OGHagen 20kV ACDCBCAD power supply needed.

2021-07-25 12:43:09 Nuttig (0)
Verzenden
antwoorden (8)