كل الرسائل

murdomurray Just connect the ground output (black) to the POSITIVE supply of the circuit, and the -12V (red) connector to the GROUND Supply. Be sure to have the circuit isolated from any other circuits including any output signals..

2019-10-22 08:05:27 مساعدة (4)
عرض
أجابات (7)

BG429352233 about all technical details you can read in description

2022-02-18 03:48:21 مساعدة (0)
عرض
أجابات (1)

OGHagen Wow dude. You are really cranking them out. 4 of this tower. You must really like bending LED leads. I've just finished a 12x12 and 95% of a 16x16 tower. I thought that was a chore. Hey, could someone make a 64x128 Canton tower for 312harhue51 please?

312harhue51 05/03/2021
2
تعليقات (5)

سؤال: is it waterproof

السؤال بواسطة Arkatitanic على 2019-09-02 04:39:32

OGHagen Not waterproof

2021-08-04 04:04:40 مساعدة (0)
عرض
أجابات (24)

سؤال: I only want it to record with motion detection. Can this only turn on and start recording with motion only?

السؤال بواسطة Goodshopper على 2019-06-27 08:59:04

OGHagen You are lucky if you get it to record anything at all. You will also be disappointed by the result.

2021-08-04 04:04:19 مساعدة (0)
عرض
أجابات (4)

سؤال: it is a waterproof

السؤال بواسطة shashihassan823 على 2020-01-17 02:21:52

OGHagen No. It is absolutely not waterproof.

2021-08-04 03:55:28 مساعدة (0)
عرض
أجابات (2)

OGHagen I have this kit laying around. I have not started assembly yet as the tiny pitch of the square chip is a challenge. You hot aired soldered that? I have several kinds of flux and solder paste in syringes, but not a electric hot air gun. I have a butane soldering iron kit with sort of a tube attachment tip. Is that what you used? In picture 8 the area around the chip looks kind of scorched. Why is that?

gauravsanu 20/03/2021
8
تعليقات (6)

OGHagen The 25? May be the week number. We have many kinds of keeping track of time. Hours, minutes, years, months, day of the month, day of the week. Week number is yet another one and it is probably the less used. Week number is often used in planning for activities. Common in the field of construction. Today is Saturday July 31 2021 week 30. For me and where I live that is. The same is true in the US. Tomorrow will still be week 30. However in the US it will be week 31. That is because we count Monday as the first day of the week. In the US it is Sundays. In Islamic countries it is Saturdays. In Saudi Arabia it is now week 32. Yep. This is because what counts as week 1 is also different within this systems. January 1, January 4 or Thursday.

2021-07-31 11:23:43 مساعدة (1)
عرض
أجابات (4)

سؤال: Does this particular model require welding?

السؤال بواسطة BG215201972 على 2021-07-11 11:10:56

OGHagen I would assume soldering is needed. In picture 3 all the small parts are shown individually. In picture 7 they are soldered on. The tricky part to solder is the small square chip on the right hand side in picture 7.

2021-07-31 10:06:22 مساعدة (0)
عرض
أجابات (1)

سؤال: my kit was supplied without the MC U chip can someone please advise what type it is and the details please

السؤال بواسطة gabiwabi على 2021-07-28 05:41:24

OGHagen Are you sure you didn't just misplace it? The one I received were just wrapped in ordinary masking tape together with a very small piece of foam material.

2021-07-28 11:00:32 مساعدة (1)
عرض
أجابات (2)

سؤال: POWER SUPPLY ? WHERE TO CONNECT ? AND WHAT VOLTAGE CURRENT ?

السؤال بواسطة s_rm2002 على 2019-04-16 06:44:10

OGHagen 20kV ACDCBCAD power supply needed.

2021-07-25 12:43:09 مساعدة (0)
عرض
أجابات (8)

سؤال: vendedor realmente o drone vem com 2 baterias pelo preço BR R*****,36 + O FRETE?

السؤال بواسطة hawlles على 2021-07-18 02:44:39

OGHagen ues

2021-07-25 12:40:38 مساعدة (0)
عرض
أجابات (8)